Stabilizer kit complete — Photo may not be your exact model but depicts the same mounting configuration. The weld-on tower is just in front of the tank and requires 2 very small welds on each side of the frame bracket. Normal installation time is about 45 minutes including the welding. The rest of the kit bolts to the existing stock triple clamp.Stabilizer kit completeMount kit only — Photo shows where the Weld-on tower is positioned and the size of the small welds required on each side of the tower. The handlebar clamp bolts to the existing lower bar perches.